The following research questions are under consideration. Some will soon become KEM projects and some are still pending because of relative lack of urgency or require a better articulation to be succesful and others are just waiting on results of ongoing projects before reconsidering.
- Evaluation of additional risks for transport of H2or CO2in existing gas transport networks (KEM-29, 2021)
- Classification safety culture, impact on mining risks (KEM-30, SEM, 2019)
- Soil subsidence impact models in DRA tool and data (KEM-37, 2021)
- Optimisation strategy monitoring soil subsidence/rising (KEM-38, 2021)
- Mechanical softening due to cyclic loading storage (KEM-40, 2021)
- Model/data alignment DRA tool and NPR (cf. KEM-20) (KEM-41, 2021)
- Soil subsidence risks former coal mining Limburg (KEM-45, 2021)
- Seismicity of offshore Q quadrants, H-Holland and Utrecht (KEM-46, 2022)
- Feasibility study large-scale water injection Groningen (2023-c)
- Geothermal early micro-seismic detection and monitoring, modelling Bergermeer (2023-e)
- Reassessing seismicity Limburg (2024-a)
- Adapting the Groningen seismological model to small onshore gas fields (2024-c)
- Model assessment and testing utility for induced seismicity geo-engineering (2024-e)
- Regaining confidence in decisions in geo-energy (2024-f, SEM)
- Evaluation of Mmax and Msim of small gas fields (2024-g)
- Fracture development after salt cavern closure (2025-a)
- Interactions between salt caverns with different storage cycles (2025-b)
- Monitoring methods and strategy for salt cavens after abandonment (2025-c)
- Induced seismicity trailing effects of matrix permeability dominated systems (2025-d)